feather river route造句
例句與造句
- The Feather River route was complete for the Western Pacific Railroad in 1911.
- It was originally built in 1909 as part of the Feather River Route.
- The Feather River Route uses the lakebed's east side between Sulphur and Gerlach.
- During the 1970s, the Feather River Route experienced modernization, as operations became computerized.
- Most of the remaining portion of the Feather River Route follows State Route 49 in Nevada.
- It's difficult to find feather river route in a sentence. 用feather river route造句挺難的
- East of Pleasanton and Livermore, the line runs through the Altamont Pass on the original Feather River Route.
- In 1907 was renamed Shafter in 1907, when the Western Pacific Railroad's Feather River Route arrived.
- The Western Pacific Railroad acquired the Alameda and San Joaquin Railroad and began construction on what would become the Feather River Route.
- The portion still called the Feather River Route by the Union Pacific runs from the California Central Valley to Winnemucca, Nevada.
- After the acquisition by the Union Pacific, a second section of the former Feather River Route was converted to directional running.
- In 1906, the Chilcoot Tunnel was constructed beneath Beckwourth Pass by the Western Pacific Railroad as part of its Feather River Route.
- I-80 follows the historical routes of the California Trail, First Transcontinental Railroad and Feather River Route throughout portions of Nevada.
- Portola is a crew change site on the Western Pacific Railroad ( now Union Pacific Railroad ) Feather River Route over the Sierra Nevada mountains.
- A short four years after its founding, Utah Construction Company was awarded the contract to build the Feather River route between Salt Lake City.
- The original California Zephyr used the Feather River Route as its path through the Sierra Nevada, and served different cities west of Winnemucca, Nevada.
更多例句: 下一頁(yè)